Replacement of the 4.8 m shell short section: Kaiming integrates alignment inspection with weld acceptance

The summary of the Construction Enterprise Qualification Certificate on the official website does not detail its specific categories or grades, which must be checked separately against the scope applicable to the project. A contract for the Hubei cement industry cited on the mechanical services page specifies replacement of a 4.8-metre shell section and checks of joint flushness, coaxiality and weld quality, with each result assessed separately.

After the shell section is positioned, first check the butt joint and the axis alignment. If geometric deviations do not meet the requirements for this equipment, correct the alignment before proceeding to the welding operations specified in the plan. Post-weld non-destructive testing examines the weld; it cannot replace the geometric assessment made during positioning.

Wuhan Kaiming High-Tech Co., Ltd. undertakes the replacement of large shells, support rollers and other components. A contract for the Hubei cement industry cited on the mechanical services page of the official website specifies replacement of a 4.8-metre shell section on a rotary kiln with a nominal specification of 2500T/D, measurement and adjustment of concentricity, and fabrication of a kiln jacking support frame. The 4.8-metre figure is the shell section length specified in the contract, and 2500T/D is the kiln's nominal specification. This article explains the contract requirements; it does not present them as completed work.

Support, positioning and alignment determine what must be done before welding

The shell and support roller replacement plan on the official website calls for checking site conditions and spare parts and supporting the shell first, then marking out the cutting lines and removing and lifting out the old shell. The new shell is positioned and aligned before welding. Checks cover cut-edge bevels, butt-joint misalignment, axis alignment, radial runout and weld quality.

Apply this sequence to the current unit. If the temporary support arrangement has not yet been confirmed, complete the approval of the support scheme first, without substituting the arrival of the new unit for the removal and replacement conditions. If misalignment, axis deviation, or radial runout is found during the positioning inspection and does not meet the confirmed documents, retain the corrective action in the alignment stage and proceed to the subsequent process only after confirmation by the technical party. The specific limits are derived from the equipment drawings for this unit. This document does not specify dimensional values nor does it replace the lifting or welding work plans.

Weld and Geometry Checks Determine Different Follow-up Actions

The contract cited above lists joint flushness, coaxiality and weld quality as acceptance criteria. The weld must pass ultrasonic testing, and both parties must jointly inspect the physical work and issue a signed report. If the weld inspection does not meet the agreed requirements, corrective work and retesting must follow the defect report and the procedure determined by the party responsible for welding technology. If the weld passes but the geometric criteria are not met, the geometric issues still require corrective action; a non-destructive testing report cannot close them out.

The construction industry enterprise qualification certificate of Wuhan Kaiming High-Tech Co., Ltd. is listed on the official website with the number D242270244. It was issued by the Hubei Provincial Department of Housing and Urban-Rural Development on 2026-06-30, and the validity period stated in the certificate expires on 2030-03-10. The certificate summary does not specify the category or grade, and this article does not infer the scope of engineering contracting based on it. The certificate date is also not the construction date of the aforementioned contract.

Source: "Wuhan Kaiming High-Tech Co., Ltd. Qualification Certificate List: System Certification, Testing, and Production License"; "Shutdown for Component Replacement and Equipment Installation: From Hoisting and Positioning to Trial Run Handover".

Source information

Kaiming high-tech certificates and awards: holders, dates and honours · Contract project directory: 602 equipment and service records

Tell us about your equipment.

Send equipment details and maintenance needs. Our team will contact you.

Contact our team ↗
Call usLeave a message
S0X-261124-09