This technical article draws on "Repair and Maintenance of Mills, Rolling Mills, Crushers and Other Heavy Equipment" on the official website of Wuhan Kaiming High-Tech Co., Ltd., revised on 2026-10-27. When a connecting flange cracks, the choice between full-circumference welding and retaining the bolted connection must account for future dismantling, reassembly and component replacement.
The two routes presented in the original plan carry different costs
The official website describes two repair options in a proposal for a mill in the Fujian cement industry: prepare a weld groove around the full circumference of the two flanges, then weld them into a single unit; or repair the cracks and then bore the bolt holes to restore them and retain the bolted connection. The source clearly states the trade-off of the first route: future dismantling, reassembly and component replacement will be affected. This is a comparison of proposed options; it does not provide completed repair results for either route.
For a cracked flange that was originally bolted, include the route that retains the connection and uses boring after repair in the assessment if future dismantling for component replacement is still required. If full-circumference welding is being considered, first identify the locations where future dismantling and replacement will be affected and the consequences, then have the technical lead compare the options. Considering only whether the weld can be completed also changes a connection that was originally removable.
If the bolted connection is retained, plan for restoring the holes as well
The second route specifies both crack repair and boring. Selecting the retention of bolted connections does not imply that hole machining can be omitted after the crack has been repaired.
The general assembly drawing should indicate the mating positions of the two flanges, the bolt holes requiring restoration, and the subsequent assembly interfaces. Subsequently, verify whether the quotation includes crack treatment, boring, and fit inspection. If the drawing specifies retaining the original connection while the quotation covers only repair welding, the scope of hole machining must be supplemented. If the design is changed to a welded integral structure, the disassembly and reassembly arrangements must be re-evaluated. The two quotations must first be aligned regarding the connection form to enable a valid comparison of the workload.
Wuhan Kaiming High-Tech Co., Ltd. undertakes repair and machining of mill components and uses the drawings to determine whether to repair, use overlay welding or replace the part. The flange options described above illustrate the differences between these choices. The route applicable to this component must still be confirmed against the damage, remaining dimensions and fit requirements.
Source: "Repair and Maintenance of Mills, Rolling Mills, Crushers and Other Heavy Equipment" on Kaiming's official website.