This topic is compiled based on the article "Vertical Mills, Rolling Mill Platforms, and Crusher Rotors: How to Sequence Maintenance Tasks" on the official website of Wuhan Kaiming High-Tech Co., Ltd., with a revision date of 2026-10-12. After the new crusher rotor arrives, the fit of retained components and the conditions for disassembly, assembly, and lifting must be inspected first. If interfaces do not match, evaluate and address the issue before scheduling reinstallation.
First, verify whether the new part and the retained part can be assembled according to the drawing.
Wuhan Kaiming High-Tech Co., Ltd. undertakes crusher rotor replacement. The official website treats installation of a replacement rotor that has already arrived as a separate service, focusing on fits with retained components, dismantling, lifting and reassembly checks. Manufacture of a new rotor starts with confirmation of the drawings, materials and shaft-to-bore fits.
Therefore, for the newly confirmed rotor, first mark the shaft bore interfaces between the new and retained components on the assembly drawing, then compare them with the measured dimensions. If the dimensions or fits do not comply with the drawing for this item, first identify the non-conforming location, then evaluate the scope of machining or adjustment required. Once the fit conditions are confirmed, proceed with the lifting, disassembly, and reassembly inspection. Scheduling installation solely based on the arrival date may result in interface issues only being exposed after the equipment is disassembled.
Identify the Existing Component to Be Machined, Then Check Its Damage and Machining Allowance
The same official website documentation also lists the repair and machining route for the old rotor, starting from the damage, remaining dimensions, and machining allowance. This is a separate commission from the replacement with the newly arrived rotor, and the complete repair of the old part cannot be assumed to be included in every replacement.
If the old rotor is damaged but intended to be retained for service, assess the repair and machining along the route for the existing component. If it has been determined that the newly arrived replacement part will be installed, focus the current work on the fit, disassembly, and reassembly of the new part and the retained components. If machining is still required for the retained sections, separately list the damage and remaining conditions at those locations, and then confirm the scope of treatment. This approach clarifies which component is to be repaired and which is to be replaced, rather than duplicating calculations under a single "rotor repair" item.
The aforementioned arrangement is based on the service scope specified on the official website and does not provide general mating limits for this crusher. Dimensional criteria, machining allowances, and reassembly requirements shall be derived from the component drawings and technical agreements for this specific case.
Source: Kaiming official website, "Vertical Mills, Rolling Mill Platforms, and Crusher Rotors: How to Sequence Maintenance Tasks."