Industrial equipment restoration & engineeringwww.whkmgx.com13995571345 / 13349867738
Wuhan Kaiming High-Tech Co., Ltd.

Kaiming Repair Process Monitoring Platform Registration: Set Thickness and Temperature Control before Layered Material Build-up on Support Rollers

The repair process monitoring platform completed software copyright registration on 2021-10-18. Drawing on published repair processes, this article explains how to reassess material build-up thickness when material loss depth or the remaining cross-section changes after cleaning, and how the material, thickness and shape of a large-diameter support roller affect temperature control arrangements.

On 2021-10-18, Intelligent Monitoring Platform for the Metal Surface Repair Process of Mechanical Equipment V1.0 completed software copyright registration under Wuhan Kaiming High-Tech Co., Ltd. For layered material build-up on a support roller, first determine the build-up thickness from the base material, material loss depth, remaining cross-section and fit specified on the drawing. Then establish temperature control according to material, thickness, size and shape. Reassess both arrangements if the workpiece conditions change.

The certificate registration number is 2021SR1521316. The registration information confirms ownership. The following recommendations on layering and temperature control are based on the support roller and large-component repair processes published by Wuhan Kaiming High-Tech Co., Ltd. Registration is not treated as proof that the platform has been used for work on this particular workpiece.

Reassess material build-up thickness when the extent of material loss changes

The service description on the website considers material build-up thickness together with the base material, material loss depth, remaining cross-section and fit specified on the drawing. The support roller process allows both single-pass, single-layer cladding and multipass, multilayer build-up. From the inside out, the repair build-up consists of bonding, transition, working and machining layers.

When planning work on this basis, if cleaning reveals that the actual material loss depth or remaining cross-section differs from the original estimate, first redetermine the material build-up thickness, then assess whether the original layering plan remains adequate. Continue with the established plan only if the conditions remain within the originally defined range. Building up only to the originally estimated thickness may fail to match the actual material loss after cleaning or the final machining target.

Where multipass, multilayer build-up is required, the process plan should also specify the sequence of the functional layers. Simply stating 'add a few more layers' does not explain the progression from the bonding layer to the machining layer. Determine the layer names and sequence according to the functionally graded repair process selected for the workpiece.

Temperature control for a large-diameter support roller must also reflect the individual workpiece

The published support roller process states that temperature control is based on material, thickness, size and shape, with the aim of meeting the fusion requirements for the substrate and fusion zone. The same factors govern temperature control for large-diameter support rollers.

Therefore, if the reference component and the current workpiece differ in material, thickness or shape, reassess the temperature control arrangements first rather than simply reusing the parameters and extending the cladding time. If these conditions have not been established, complete the process design for the workpiece before work starts. Otherwise, determining the material build-up thickness alone does not establish whether the temperature control conditions are suitable for this support roller.

The specific temperatures and number of layers are determined by the process plan for the workpiece.

Sources: the National Copyright Administration's Computer Software Copyright Registration Certificate for the repair process monitoring platform; 'Material Build-up, Turning and Grinding for Support Rollers and Kiln Tyres: Layered Materials, Inspection and Reinstallation Dimensions' on Kaiming's official website.

Source information

Kaiming high-tech certificates and awards: holders, dates and honours · Contract project directory: 602 equipment and service records