Repeated steam leaks: trace the damage to the same pipe section
Use the pipe-section number to connect records of repeated leaks in the same steam line. Mark each leak, repair and replacement area on the drawing. Distinguish the pipe wall, welds and connections, and record the operating conditions and medium parameters when each leak occurred.
Inspect the proposed repair location together with adjacent old pipe and old-to-new interfaces to establish the problem source and limits of the work. Keep the same identification on inspection, construction and completion records for use in later overhauls.
Compare repair, local replacement and section-by-section replacement by their deliverables. Repair records identify treated locations and post-repair checks. Local replacement specifies the start and end points, new-pipe material and both end connections. Section-by-section replacement schedules steam-isolation handover, installation and final inspection for each section. List preparation, isolation, work and reinspection times separately for each option so the plant can assess production impact.
