Match the steam-shutdown schedule and quotation to the same scope
Steam-shutdown work starts with information and plan confirmation and material preparation, followed by mobilisation. The plant then shuts down, isolates and safely hands over the equipment. Inspection, repair or replacement, agreed inspections and tests, and handover for restart follow. Identify the performing party, site-condition provider and confirming person at each stage, and allow time for reinspection and correction.
When damage outside the original scope is found, record the component, location, dimensions, photographs and operating conditions before comparing it with that scope. Document the additional work, cost, time and responsibilities in a variation confirmed by both parties before proceeding. Retain the two sets of records separately.
Price inspection, repair, pipe replacement and acceptance against the same component and drawing revision. State responsibility and pricing scope for dismantling and reassembly, transport, packing, lifting, site assistance and travel. List extra work separately so alternatives can be compared on the same quantities of work.