Use the component number to connect drawings, damage and checks
Organise enquiry information by component number: drawings, substrate and heat-treatment condition, original and remaining dimensions, damage location and depth, loads and temperatures, and previous repair records. Mark material-loss areas, retained substrate, build-up handover dimensions and final fit dimensions separately on the drawing. For site work, add the equipment layout, access, working space and support mounting positions.
Before work, both parties agree pre-repair damage and dimensions, repair areas and process, and finished dimensions and fit checks. List measurement points, methods, criteria and the confirming person for each check. If damage outside the agreed scope appears, first record its location, dimensions and photographs, then document additional operations, cost and time as a variation. Continue after confirmation and retain the original and additional work records separately.
