Collect replacement and trial-operation records by equipment number
The Shandong overhaul contract requires recording original structural data before work, operation acceptance and concealed-work confirmation; retaining before-and-after repair and machining photographs and inspection data; remeasurement after adjustment and a formal written monitoring report; and assistance with the client’s trial operation. Installation plans also include no-load trials, loaded trials and joint acceptance. File records by equipment number. Typical handover includes equipment and replacement-part lists, installation datums, dismantling and reassembly and replacement records, alignment and fit checks, and trial-operation handover records.
Quotation information includes equipment lists, drawings and manuals, dismantling and replacement scope, old and new dimensions and materials, installation datums, weights and lifting conditions, plus isolation and shutdown arrangements, transport routes, positioning space and interfaces with plant maintenance and other crews. Record additional damage found during dismantling by location, dimensions and photographs. Document extra scope, cost and time as a variation, then continue after both parties confirm. Itemise responsibility for dismantling and reassembly, transport, packing, lifting, site assistance and travel. Separately agree in the contract whether refractory work and electrical instrumentation are included.