Wuhan Kaiming High-Tech Co., Ltd. provides boiler and pressure piping inspection, repair and replacement for chemical, power, metallurgical and building-materials plants. The scope covers leaking or damaged pipe sections and replacement connections, with 24-hour emergency repair listed in its published services.
Typical equipment and parts
Boilers, steam piping and industrial process piping; damaged or leaking sections, joints, valves and the connections between retained and replacement piping.
Process and standards
Identify the equipment category, medium, material, pressure, temperature, defect location and isolation conditions. Define the inspection, repair, replacement and connection work separately, with agreed checks and handover records for each pipe section.
Published licensing categories include boiler installation including repair and alteration, Class B, and industrial pressure piping installation, GC2. Check the current licence, personnel and applicable scope against the equipment and work. Inspection and acceptance requirements are set in the technical documents for the specified sections and connections.
Project records
Dates refer to contract or agreed-start months. The entries describe recorded scopes of work. These entries document piping work; a pressure class or boiler-specific scope is included only where stated in the source.
2025-04 | Shandong | steel | gas pipeline | restoration and overhaul
2023-08 | Qinghai | chemical | piping, valve | welding, replacement, installation; contract
2022-12 | Qinghai | chemical | piping, valve | welding, dismantling, replacement, installation; contract