Wuhan Kaiming High-Tech Co., Ltd. carries out plant overhaul and equipment installation for cement, steel and chemical-industry equipment. Shutdown work includes dismantling, lifting, replacement and reinstallation of shells, rollers, tyres and gearing.
Typical equipment and parts
Cement kilns and large rotating equipment; kiln shells, support rollers and tyres; pinions and girth gears; converters, calciners and related mechanical assemblies.
Process and standards
Prepare the equipment and replacement-part list, then coordinate lifting, dismantling, replacement, alignment and reinstallation with the shutdown sequence. Mechanical, electrical and welding interfaces are defined for the equipment and the associated repair or machining work.
Agree installation datums, replacement records, alignment and fit checks, and trial-running handover requirements for the specified equipment. The equipment drawings and the agreed installation documents define the inspection and acceptance items.
Project records
Dates refer to contract or agreed-start months. The entries describe recorded scopes of work.
2024-02 | Gansu | Cement | Rotary kiln / Tyre | Installation and overhaul
2022-11 | Xinjiang | Steel | Converter | Installation and overhaul
2022-09 | Qinghai | Chemicals | Lime slaker / Support roller / Tyre | Installation and overhaul