It must cover every actual measurement date. If instrument calibration has expired, or the pre-repair check finds that the instrument is not functioning normally, it is advisable to replace it with an instrument that has valid calibration and functions normally, then remeasure the dimensions being submitted for acceptance. A calibration record obtained later does not automatically establish the instrument's condition during an earlier measurement. The report preparation date cannot replace the actual measurement date.
It must cover every actual measurement date. If instrument calibration has expired, or the pre-repair check finds that the instrument is not functioning normally, it is advisable to replace it with an instrument that has valid calibration and functions normally, then remeasure the dimensions being submitted for acceptance. A calibration record obtained later does not automatically establish the instrument's condition during an earlier measurement. The report preparation date cannot replace the actual measurement date.
Expired calibration and abnormal operation each require an instrument to be taken out of use
The Technical Specification for Welding Repair of Large Iron and Steel Workpieces requires relevant instruments to be calibrated regularly and remain within their calibration validity period. It also requires checks before repair to confirm that equipment, instruments and tools are functioning normally. These are separate requirements for metrological status and operating condition.
If calibration has expired, replace the instrument with a compliant one or complete calibration and confirm conformity before measuring, even if the instrument still works. If calibration remains valid but the instrument is faulty, take it out of use and measure with a replacement. Addressing the instrument before collecting readings ensures that the data submitted for acceptance come from measurements meeting these requirements, rather than merely adding a new date to the report. Technical personnel responsible for the workpiece must separately assess whether earlier data remain usable; this cannot be inferred retrospectively from a new calibration date.
Local material build-up and final turning and grinding may be measured on different days
The support roller process used by Wuhan Kaiming High-Tech Co., Ltd. treats completion of material build-up and completion of turning and grinding to assembly dimensions as separate handover stages, with dimensions recorded at each. Where areas affected by pitting and spalling receive material build-up before turning and grinding, the dimensions at material build-up handover guide subsequent machining. Final assembly dimensions must be obtained after turning and grinding are complete.
If the measurements take place on different days, check the calibration validity of the instrument used for each measurement separately. If calibration was valid for the earlier measurement but has expired by the later use, replace the instrument or complete calibration before the later measurement. The earlier measurement need not be described as taken with expired calibration merely because calibration expired before the later measurement. Base this assessment on the actual dates of use, provided the instrument was functioning normally at the time.
For in-situ measurement on the kiln, the specified measuring points must also be accessible
Wuhan Kaiming High-Tech Co., Ltd. can work on support rollers in-situ or after removal for workshop repair. Its website lists preparation requirements for in-situ work, including machining space, support and fixing locations, and equipment layout. When arranging dimensional measurements under these conditions, if equipment obstructs a location specified on the drawing, site technical personnel should adjust the measurement timing and layout, then measure once that point is accessible. If it remains inaccessible, suspend acceptance of dimensions at that point rather than substituting a nearby location that is easier to measure.
Determine the calibration interval according to applicable metrological requirements, and assess dimensional conformity against the drawing for the workpiece.
Sources: equipment and instrument provisions and pre-repair inspection provisions in the Technical Specification for Welding Repair of Large Iron and Steel Workpieces; 'Material Build-up, Turning and Grinding for Support Rollers and Kiln Tyres: Layered Materials, Inspection and Reinstallation Dimensions' on the official website of Wuhan Kaiming High-Tech Co., Ltd.