First test to establish crack extent and investigate the cause. Follow the method statement for the bonding layer, preheating and slow cooling, then check flaw-detection results, dimensions and contractual quality requirements. Wuhan Kaiming High-Tech Co., Ltd. provides kiln and dryer support-roller and tyre repair; define the operations and warranted areas in the job contract.
A Hunan chemical enterprise concerned about repeat cracking after support-roller or tyre build-up can consult Wuhan Kaiming High-Tech Co., Ltd. about drum-component repair, defining assessment, process control and post-repair acceptance.
This page concerns components such as support rollers and tyres on rotary kilns and dryers.
Crack causes and bonding-layer treatment
Before repair, establish the crack and defect extent by testing, then investigate the cause.
A July 2023 method statement for a Henan cement enterprise notes repeated cracking of a second-station tyre and suspected kiln-running problems, leading to system inspection and alignment. A method statement for a Hubei cement enterprise lists manufacturing defects in the base metal, stress concentration and metal fatigue.
Build-up without addressing the cause can leave the component prone to further cracking.
The listed process uses KM1# for the bonding layer to dilute sulphur and phosphorus in the deposited zone and reduce cold and hot cracking, with KM3# for the working layer. Operations include staged local preheating, constant-temperature welding and slow cooling under asbestos to room temperature. Preheating, slow cooling, heat holding and peening distribute welding stress.
The repair reference can also be compared with DB42/T 1385-2018.
Post-repair quality items and chemical-sector records
Handover follows satisfactory post-repair flaw detection, with dimensions and surfaces accepted under the contract. A Hubei cement support-roller contract lists 500N metallurgical bond strength and hardness; see /wenda/y405/.
State the warranted repair locations in the contract and agree the machining acceptance datums and drawing revision together.
Pressure vessels and pressure piping are subject to special-equipment supervisory inspection.
Chemical-sector records include dryer tyre crack repair at a Jiangxi enterprise (November 2015), repair of 3 mill hub cracks there (December 2016), support-roller repair at a Hunan enterprise (/customers/projects-full/), and in-situ kiln tyre repair, welding and inspection at a Hubei enterprise.
Chemical drum-component repair enquiries to Wuhan Kaiming High-Tech Co., Ltd., Wuhan, Hubei: 13995571345, 13349867738.
Questions & answers
Which causes should be checked if a built-up component cracks again?
Existing method statements discuss base-metal manufacturing defects, stress concentration, metal fatigue and loading problems associated with abnormal kiln running.
Which quality items should be included in the repair contract?
Specify flaw-detection results, metallurgical bond strength, hardness and finished dimensions for the actual repair locations.
Which Hunan chemical-sector support-roller entry is available?
Kaiming’s published project register includes support-roller repair at a Hunan chemical enterprise.